Skip to content
Free calculator

Par level calculator

Set a par for any item from how much you use, how often it's delivered and how long an order takes to arrive — then see what to order today, rounded up to whole cases.

Free, no sign-up What you type stays in your browser

One item

What a typical day of service goes through.
Delivered Monday and Thursday: 3 or 4. Use the longer gap.
Days of service between placing the order and the delivery.
A buffer for a busy night or a late truck.
From today's count.
Ordered but not yet delivered. Optional.
Optional — to round the order up to whole cases.
Result
Order today · Chicken thighs
2 cases
80 lb — the 56 lb you need, rounded up to whole cases.
Cycle stock (until the next delivery)
54 lb
Lead stock (until this one arrives)
18 lb
Safety stock
18 lb
Par level
90 lb
− On hand and on order
34 lb
Order
56 lb
The math

How this is calculated

Par is the level you order back up to: enough to last until the next delivery, plus what gets used while this order is on its way, plus a buffer.

Cycle stock = average daily usage × days between deliveries
Lead stock = average daily usage × lead time (days)
Safety stock = days of cover × average daily usage, or a set amount
Par = cycle stock + lead stock + safety stock
Order = par − on hand − already on order
Cases = order ÷ case size, rounded up

Worked example: chicken thighs

18 lb used on an average day, a delivery every 3 days, ordered 1 day ahead, 1 day of safety stock, 34 lb on the shelf and 40 lb cases:

  1. Cycle stock = 18 lb × 3 = 54 lb
  2. Lead stock = 18 lb × 1 = 18 lb
  3. Safety stock = 18 lb × 1 = 18 lb
  4. Par = 54 + 18 + 18 = 90 lb
  5. Order = 90 lb − 34 lb = 56 lb
  6. Cases = 56 lb ÷ 40 lb = 1.4, rounded up = 2 cases (80 lb)

The extra 24 lb from rounding up to whole cases isn't waste — it simply means the next order will be smaller.

Where the inputs come from

  • Average daily usage comes from two counts and the deliveries between them: (opening count + received − closing count) ÷ days of service. A week that opens with 60 lb, receives 120 lb and closes with 54 lb used (60 + 120 − 54) ÷ 7 = 18 lb a day. Use a few weeks if you can.
  • Days between deliveries is the gap the order has to cover. Monday and Thursday deliveries leave gaps of 3 and 4 days — set a par for each delivery, or use the longer gap.
  • Lead time is the days of service between placing the order and putting it away. Ordering after close for a next-morning delivery is 0; ordering Monday morning for Wednesday morning is 2.
  • Safety stock covers a busier-than-usual day or a short delivery. Keep it small for things that spoil and larger for things that keep and that you can't be without.

Par is a ceiling as well as a floor

For short-life items — fish, berries, dairy, cut herbs — keep cycle and safety stock tight and order more often rather than carrying more. Whatever is over-ordered tends to turn up in the waste log, and cash sitting on a shelf isn't in the bank. The guide to setting par levels covers seasonal and day-of-week pars, and the bar inventory guide applies the same idea behind the bar.

Questions

Frequently asked

What is a par level?

The amount of an item you want on the shelf, or on its way, right after you place an order — enough to last until the next delivery arrives, plus a buffer. Each order is the difference between par and what you already have.

How do you calculate a par level?

Par = average daily usage × (days between deliveries + lead time in days) + safety stock. Then order = par − on hand − anything already on order, rounded up to whole cases.

How often should par levels change?

Whenever usage does: a menu change, a new season, a holiday week, a new delivery schedule. Review them at least monthly against what your counts say you actually used, and set separate pars for deliveries that have to carry you through a busy weekend.

Do par levels work for a bar?

Yes — the arithmetic is the same for bottles, kegs and cases. Work out usage from your bar counts in the unit you order in (bottles, not ounces), and keep safety stock for the brands you can't run out of on a Saturday.

Track this automatically

Orders built from par, not from memory.

In Tech for Tabs you set a par for each item and the order suggests itself from par minus what's on hand. Send it to the vendor, check the delivery against it on the dock, and set prep pars by day of the week the same way.

Ordering & order guides

Included in Kitchen, Back Office Complete, Full OS and Enterprise, from $169/month.

Or build your own with just this module for $96/month, including the platform fee and Items & price tracking and Vendors, which it needs.

Pairs with Inventory counts and Prep & waste.

14-day free trial · No credit card required · All pricing